PENANG DEVELOPMENT CORPORATION Penang Development Corporation
(PDC) wanted a new look to their corporate boardroom and
with some high tech control panel to enable them to control
the AV equipment within the room from a touch of a button.
The project itself is very simple and only took 3 working
days to complete the whole installation. |
|
|
|
| |
Integration of new technology into an existing boardroom
without compromising the aesthetic look of the room. This
is important in deciding how to wire the entire system
especially the dimming fixture for programming of the
presets and zoning buttons. |
|
|
|
| |
.
.
.
. |
Plasma
Display installation
Touch Panel to control the AV system
Ceiling Speakers for audio output
Lighting Dimming System |
|
|
| |
PDC
project is an example of the basic and simple installation
of the audio visual equipments in a boardroom application.
The normal usual installation include a projector and
a screen. However, PDC had decided not to follow the traditional
installation that will include the projector bracket protruding
or hanging from the ceiling, which will spoil the whole
classic aesthetic appeal of the boardroom. All the source
equipments are kept in the equipment rack which is hidden
in the specially design cabinet to avoid obstruction.
The whole layout was carefully planned to blend into the
room while incorporating new technology into the room.
|
|
|
|
| |
.
.
.
.
.
.
.
.
.
.
.
|
NEC 40"
Plasma
Crestron Integrated
Control System
Inline Switcher
Ecler Amplifier
Ecler Mixer
Ecler Equalizer
Altec Lansing Ceiling Speakers
Lutron Dimming Control
JVC VCR Player
JVC DVD Player
|
|
|
|
|
| |